Architecture building update

Michelle Hennon

//

var adPlayed = true;

function playerVariables(){

var videofile = ‘021513_Architecture_PKG.flv’;

var videoPath = ‘rtmp://flashmedia.kent.edu/fms-jmc/tv2/’;

var adFileName = ‘TechHelpAd_11152012_600.flv’;

var videoAdPath = ‘rtmp://flashmedia.kent.edu/fms-jmc/kentWired/’;

var adlink = “http://support.kent.edu/software”;

var width = 665; //the width of the player

var height = 450; //the height of the player

var thumbnail = ‘http://www.staterinteractive.com/photos/spring11/0131tv2.jpg’; //the URL to the thumbnail image

videotoPlay(videofile,videoPath,videoAdPath,adFileName,width,height,thumbnail,adlink);}playerVariables();

Watch TV2 live

The university does seem to be on schedule when it comes to choosing the winning design for the architecture building.

But we’re left wondering today – will the rest of the plans go on as scheduled?

The jury will put its final recommendations into a letter that will be presented to President Lefton and the steering committee.

Contact Michelle Hennon at [email protected].