Architecture building update
February 15, 2013
//
var adPlayed = true;
function playerVariables(){
var videofile = ‘021513_Architecture_PKG.flv’;
var videoPath = ‘rtmp://flashmedia.kent.edu/fms-jmc/tv2/’;
var adFileName = ‘TechHelpAd_11152012_600.flv’;
var videoAdPath = ‘rtmp://flashmedia.kent.edu/fms-jmc/kentWired/’;
var adlink = “http://support.kent.edu/software”;
var width = 665; //the width of the player
var height = 450; //the height of the player
var thumbnail = ‘http://www.staterinteractive.com/photos/spring11/0131tv2.jpg’; //the URL to the thumbnail image
videotoPlay(videofile,videoPath,videoAdPath,adFileName,width,height,thumbnail,adlink);}playerVariables();
The university does seem to be on schedule when it comes to choosing the winning design for the architecture building.
But we’re left wondering today – will the rest of the plans go on as scheduled?
The jury will put its final recommendations into a letter that will be presented to President Lefton and the steering committee.
Contact Michelle Hennon at [email protected].